Ever wondered how cold steel becomes a warm, modern lodge? Follow our six-stage journey—from design sketches to turnkey delivery.
1. Design Consultation & Concept Planning
We start with your goals, site and style. Expect layout sketches, 3-D views and a clear cost roadmap.
2. Container Selection & Base Prep
Hand-picked high-cube units are cut, treated and reinforced. Openings, frame supports and floor plates go in first.
3. Insulation & Internal Build
High-performance spray foam and breathable membranes keep the lodge cosy all year. Stud walls, floors and ceilings create the blank canvas.
4. Cladding, Finishes & Fixtures
Choose timber, composite or metal cladding, plus bespoke kitchens, bathrooms and lighting for a true home-from-home.
5. Utilities & Certification
We install and certify electrics, plumbing and heating—optionally solar, LPG or off-grid packages.
6. Delivery & On-Site Setup
A hiab lorry positions your lodge on pre-prepared pads. Decking and final touches take place the same day.